EN ▼
Favorites
My Favorites
View All
Market Cap Price 24h%

Disclaimer: Content does not constitute investment advice. Trading involves risks—please invest with caution!

Zoi Network Road Map: Upcoming product and network upgrades

2026-11-14 20:53:35
Bookmark

What are the key stages of development in the Zoi Network Road Map?

More than a billion adults do not have bank accounts, but more of them have mobile phones. Network connections are slow, expensive, and often interrupted for hours in many of the regions. Zoi is designed to fill this gap.

This paper is based on the Zoi Web Road Map published in the official White Paper, which has a way of combing its development process.

Core elements

  • Zoi publishes a named product for a specific quarter, and every step aims to achieve offline payments.
  • The eight protocol phases support these products. Each phase will be launched only when its substantive output is ready.
  • Wallet, transfers and offline payments are first opened on the Internet (privatenet).

Zoi, what's the network?

Zoi Network is a payment network specifically designed for areas with weak or missing signals.

The business company behind this is an American company registered in Wyoming, United States, that has been reaching a global audience since its first day. The application supports 19 languages, and the first mobile phones to use web services will appear in any place where the application is installed.

Zoi's philosophy and its relevance

Most payment systems assume that the connection is stable, while Zoi starts on the contrary. If two people stand next to each other, their mobile phones can pay each other through bluetooth, and the reliability of the payments depends on the level of trust between them and the additional support provided by the surrounding network.

When the Internet is back online, the payments will be settled on the chain, with the same security as any other.

Identity information remains in the hands of the issuer and will never be stored on a web-based network, a relay node or a blockchain. This is the central reason why the project exists. The clear idea is that money should be everywhere, even if it works offline.

Zoi Road map product and target date

There are clear quarterly targets for recent products and no dates for forward products. The status is classified as “online”, “ongoing” or “planned” and any change in date is published in the Update Log.

Overview of product status

_Other Organiser

  • Zoi App

Q4 2026 (ongoing):

  • Zoi Handshake (handshake), ZMesh Map (maps), Zoi Lab (laboratories)

Q1 2027 (planned):

  • ZMesh, Zoi Wallet (wallet), Authentication, Handshank Award

Q2 2027 (planned):

  • Zoi Send (Send function)

H2 2027 (planned):

  • Zoi Offline (offline payments), relay and witness awards

Zoi App is now officially online. The following is a detailed description of the Q4 2026 functions that will be launched:

Q4 2026 Landing function

Zoi Handshak (handshake):It's very simple. Two mobile phones approach through Bluetooth, and both parties get a “seen” badge. It applies to meetings, events and courses, and initially only provides for badge certification.

ZMesh Map (map):This is a real-time map that lights up city by city with the Zoi mobile. It shows only density information, without a name or a specific location for a single cell phone. The first version does not require location access.

Zoi Lab (laboratory):This is the first real-life test platform for offline priority payment networks. Zoi Lab Q4 2026 early access allows users to use bluetooth to conduct inter-celle-testing (tZOI) transfers in an Internet-free environment, and to observe the settlement process after the mobile phone is connected. Laboratory tokens have no value and will never be converted into ZOI. As they do not involve movement of material value, no identification is required.

Q1 2027 Zoi Wallet and related functions

Zoi Wallet, which is Q1 2027, consolidates the balance and history in one place. The key is generated by the user's mobile phone and Zoi never holds the key.

Three additional functions will be introduced during the same quarter:

  • ZMesh:Supports cell phone chats and SOS messaging. It operates on the same bluetooth net as the lab, so the net is validated by the message before the money flows. It does not replace emergency services.
  • OrganisationStarts the transfer function. Synchronization does not require identification.
  • Handshank Award:The ZOI awards were introduced but were strictly limited: only manually checked accounts, only once per pair for life and with a daily ceiling.

Zoi Send will be launched at Q2 2027. It allows certified users to send ZOI online, fixes the transfer conditions at 0.5 ZOI and has a daily limit.

Zoi Network Protocol Phase

Under the product, protocol is structured according to a dependency relationship.

Protocol Phase Status

  • Stage 0: Design and simulation (ongoing)
  • Phase 1: Online prototype (ongoing)
  • Phase 2: Offline transfers (ongoing)
  • Phase 3: Mobile Phone Witness (Next)
  • Stage 4: Incentive engines (planned)
  • Phase 5: Certification of payment points (planned)
  • Stage 6: Chain MVP (planned)
  • Phase 7: ecosystem (planned)

Detailed road map phase

Stage 0 to 2 is the basis. The team defines the instrument and transfer format, simulates a double payment attack, transfers through a relay broadcast, and then transfers the instrument to Bluetooth. Zoi Lab uses the test token run phase 2, and Zoi Offline then applies it to the real ZOI.

Phase 3 allows mobile phones to sign witness receipts, which are used to calculate the risk rating. Phase 4 provides incentives after settlement and adds fraud-proof rewards and anti-spam rules.

Phase 5 The registered business is a certified payment point. Phase 6 is a chain MVP, which includes a certificationer, a certificate of ownership of the chain document, and a certificate of light client. Phase 7 issues SDK and a business tool for third-party application.

ZOI Currency Road Map

It starts with the Zoi Intranet. Its creation block, which contains all the 10 billion ZOI supplies, does not make new coins after the creation. Synchronization awards are transferred from the Mining pool, subject to a daily quota. The ceiling is one that anyone can verify, not one that requires blind trust.

The daily quota and its halving date will be applied to the Intranet as of 1 December 2026. Over time, the proportion of each synchronized payment from real network work (relay and witness) will increase, while the proportion from the basic incentive will decrease.

Zoi Chainmainnet and TGE Timeline

The balance will be transferred from the inside network to the Mainnet during the token creation event (TGE). The planned conversion ratio is 1:1.

This sequence is considered. When the mainnet arrives, the walklet, the transfer and the offline payment should be fully validated in daily use. TGE will only be able to complete the transfer of the balance.

There are two pending matters to be announced before TGE: the exact date, and whether the post-removal balance is a one-time or a phased one. Zoi Chain is in the “forward” category itself, for which no specific date is available.

The outlook beyond 2027

The following projects require offline traffic, hardware support or compliance with national legislation, and therefore no specific dates are available.

  • Zoi Beacon (bender):A small-scale facility for household and small business can enhance a local network.
  • Zoi Card (card):Non-contact payment cards with security chips designed specifically for people without smartphones.
  • Zoi Pay (payment):Shops and markets accept ZOI to support online and offline payments.
  • Zoi ID (identity):A single-off certificate of private human identity.
  • Zoi SDK:Zoi offline payment infrastructure for other applications.

Concluding remarks

Zoi's Internet road map was designed to be prudent. Every step of the way was to validate it before it opened. It was slower than mass distribution, but it was easier to build trust. The team summed it up in one sentence: "Accept offline payments. Clear the chain. It was built by the mobile phone that carried it."

Disclaimer:

All content published on this website, including hyperlinks, related applications, forums, blogs, and other media accounts, originates from third-party platforms and their users. CoinMarketInsight makes no representations or warranties of any kind regarding the website or its content. All blockchain-related data and materials are provided for informational and research purposes only and do not constitute financial, legal, or investment advice. Users and third parties are solely responsible for the content they publish. CoinMarketInsight shall not be liable for any losses arising from the use of this website. You should exercise caution and conduct your own independent research, review, analysis, and verification before making any decisions.

Read Full Article
More News
TOP

TOP