Citrea announced that the Pomelo Mainnet upgrade will start on November 23, 2026
Citrea, the first ZK rollup to complete settlement on Bitcoin, has announced that it will upgrade the mainnet called “Pomelo” at 3 p.m. UTC time on Monday, 23 November 2026. This upgrade will completely relocate the Citrea scroll layer certification system and the Clementine Bridge certification system to the SP1 ZkVM, developed by the Succinc Labs. This initiative, according to the team, will significantly increase the cost-effectiveness and reduce delays.
According to the Citrea official announcement, the Pomelo upgrade marks the first time that the network has made a full-scale overhaul of the ground-level certification infrastructure since January 2026, when it came online. SP1 is based on the RISC-V architecture, which is designed to provide a certification service for standard Rust codes. The team states that this not only simplifys the certification process but also enhances the overall performance.
Why Citrea to switch to proof infrastructure: SP1 zkVM
Citrea uses a two-tiered certification model: Batch Proofs and Light Clients demonstrate that the bridge is routed through a Clementine anchoring mechanism based on BitVM2. With Pomelo activated, all three levels will be on board SP1. BitVM2 is a framework that allows optimistic validation of Bitcoin scripts, which allows for minimal trust between Bitcoin and Layer 2 networks without changing the basic protocol of Bitcoin.
Citrea has committed in his blog post to full transparency of the code library and will publish GitHub links after the upgrade is completed.
Upgrading schedule and projected downtime
On November 23rd, the upgrade window lasted three hours. Citrea's bulletin states that during this window, the actual mainnet stop was only a few minutes. The L2 fork, which activates the new certification rules on the network level, is scheduled to take effect on Wednesday, November 25, 2026, which leaves the team with a two-day buffer period between the infrastructure migration and the change in the consensus layer.
In addition, the bulletin mentions that the Clementine Bridge may require additional time to re-link after upgrade.
Background: Citrea's position in Bitcoin Layer 2 ecology
According to industry media reports, Citrea officially launched the mainnet on 27 January 2026, making it the first production-grade ZK rollup to settle on Bitcoin using BitVM technology. The network was developed by Chainway Labs. Chainway Labs has reportedly raised $16.7 million through two rounds of financing, with investors including Peter Tyre-related Founders Fund and Galaxy Ventures.
The co-founder and CEO of Chainway Labs, Orkun Kilic, said on the line that Bitcoin is the world’s largest digital asset, but its role in financial markets has been limited. He noted that the introduction of the minenet has enabled capital to be deployed, managed and settled directly in the primary Bitcoin market. Pomelo’s upgrade is the first infrastructure change in the network since it became online.
By the time the promotion was announced on 23 November 2026, the data showed that Bitcoin ' s price was US$ 61,166, which had risen by 3.31 per cent in the past 24 hours.

Exchange Ranking
Top Exchanges
24h Volume Ranking
Popularity Ranking
Exchange BTC Balance
Proof of Reserves
Decentralized Exchanges
Funding Rate
Funding Heatmap
Liquidation Data
Max Pain
Long/Short Ratio
Whale L/S Ratio
Binance/Okex/Huobi L/S
Bitfinex Margin L/S
ETF Tracker
Solana ETF
XRP ETF
Hong Kong ETF
Bitcoin Treasuries
Crypto Reversal
Ethereum Reserves
HyperLiquid Wallet Analysis
Hyperliquid Whale Watch
Large Transactions
On-chain Movement
Bitcoin ROI
Stablecoin Market Cap
Options Analysis
News
Articles
Economic Calendar
Features
Wallet
Contract Calculator
Security
Collections
Watchlist
Following
BTC